On 27 November, the Mayor Jaime Diaz Ochoa, forward a bit what I had planned once taking office: the people charge you the cost of street lighting in the municipality osmosis training they mean a year 120 million pesos.
For Geothermal Cerro Prieto and private generating companies electricity in Mexicali, said that it will seek to benefit the municipality, which pays 120 million dollars a year for street lighting service, said at the time in presentation of his cabinet.
For purposes of this tax shall be understood as public lighting, Streets, avenues, boulevards, parks, gardens, public squares and other Community Areas, whose power consumption is in charge of the City of Tijuana or its paramunicipal. 17 This tax will learn to make the payment of the bill for electricity consumption issued by the Federal Electricity Commission (CFE), by consumers through their fundraising offices, according to the following:
A) -. Monthly consumption (kwh) of 0-300 0.50 TIMES / MONTH B) -. Monthly consumption (kwh) of 301-600 1.00 TIMES / MONTH C) -. Monthly consumption (kwh) of 601 to 1.000 1.50 TIMES / MES D) -. monthly consumption (kwh) of 1.001 to 2.000 2.00 TIMES / MONTH E) -. monthly consumption (kwh) of 2.001 to 3.000 4.00 TIMES / MONTH F) -. monthly consumption (kwh) of 3,001 TIMES hereafter 5.00 / MES
. V) - For the purposes of collecting the tax rate for street lighting is subject to the following:. A) - is considered domestic osmosis training or residential rate, which determines the Federal Electricity Commission osmosis training as such.
C) -. Were considered general service rate in medium voltage for commercial use, or Industrial Services, which name the Federal Electricity Commission as OM and HM (Regular Rate for General Service Medium Voltage less than 100 KW demand Time and Rate for General Service Medium osmosis training Voltage with demand of 100 kW or more, respectively).
D) -. Was considered as the rate of heavy Industrial General Service Subtransmission osmosis training High Voltage Level, which called the Federal Electricity Commission as HS and HSL (Time General Service Rate for High Voltage, Sub-transmission and ServicioGeneral Time Rate for High Level voltage subtransmission level, for long use, respectively).
Not be obliged to pay this tax in the case of the electricity consumers who have contracted with the Federal Electricity Commission service for street lighting (Tarifa 5A) and service pumping drinking water or wastewater utility services for water pumping for irrigation and low voltage service for pumping water for agricultural irrigation in medium voltage (rate 06, 09 and 9M), as well as the consumption of the services contracted by Federal, State and Municipal Public Entities .
Cops pull anti-bullet jackets, uniforms and boots in the Government Palace osmosis training in Oaxaca to demand wages and bonuses Pavel | December 24, 2013
Also in Pulse Citizen "I'm so afraid that I can not have more," he says, hidden osmosis training administrator in FB "value Tamaulipas" criminal group wants the head administrator of a Facebook page Facebook user threatened in Mexico blame Do not we all corrupt officials surrender osmosis training to you, answer "Tamaulipas value" "value Tamaulipas" disappears from Facebook and Twitter "value Tamaulipas" announces closure: "I will never stop worrying about you," threatened by narco blogger: "I I can not fight it "The 18 tweets that promoted hatred against osmosis training teachers
No comments:
Post a Comment